rail

Barcelona Port affected by a lack of investment from the Spanish Government

March 6, 2012 12:13 AM | CNA

The enlargement of Barcelona Port, where Hutchison’s new container terminal will be located, was supposed to be linked by International-width standard railway to Central Europe and be better connected by road. However, the Spanish Minister for Transport and Public Works, Ana Pastor, announced that work cannot start this year; neither can she guarantee the provisional solution will be in place in June, when the new container terminal was supposed to start operating. Since the Spanish Government has not started the work, the technical studies have expired. “Hopefully they will be redone by the end of the year”, said Pastor.

Catalans shocked by decision to prioritise the Central Railway Corridor

February 17, 2012 12:16 AM | CNA / Gaspar Pericay Coll

The Spanish Minister for Public Works and Transport, Ana Pastor, announced she would prioritise the Central Railway Corridor, which would link the Gibraltar area with Madrid, Zaragoza, Toulouse and the rest of Europe through the Central Pyrenees. The European Commission announced in October it would not fund the Central Corridor, but those along the Mediterranean and the Atlantic coasts, where the main industrial centres and ports are located. The Catalan business community and political parties have pushed for the Mediterranean Corridor. Their fear was that the current crisis combined with prioritising the construction of a second corridor might push resources away from the Mediterranean.

The Spanish Government recognises a €5.75 billion lack of investment in railway infrastructure in Catalonia

February 13, 2012 10:53 PM | CNA / Gaspar Pericay Coll

After last week’s minor train accident, the Spanish Minister for Transport, Ana Pastor, wanted to personally check Barcelona Metropolitan Area’s railway infrastructure. Pastor has recognised that the Spanish Government had not invested the required amount in railway infrastructure in Catalonia. She said that €5.748 billion has not been invested. Many Catalan voices have criticised the Spanish Government’s lack of investment in key transport infrastructure for Catalonia’s economy.

Catalonia, Valencia and Murcia combine forces for the Mediterranean Railway Corridor to be included as a European priority

September 16, 2011 11:16 PM | CNA / Gaspar Pericay Coll

The presidents of Catalonia, the Valencian Community and the Region of Murcia met in Barcelona to ask the Spanish Government to prioritise the construction and inclusion of the Mediterranean Railway Corridor in the European Transport network. This infrastructure is essential for both the Spanish and European economies, as it would transport freight and passengers non-stop from Gibraltar to Stockholm, passing through Valencia, Barcelona and Lyon. In times of public deficit, there is not enough money to build a railway corridor passing through Madrid, and the Spanish Government has to prioritise the Mediterranean Corridor, which links the main export and industrial centres in the country with Europe.

The Spanish Government says now that both the Mediterranean and the Mid-Pyrenees Railway Corridors are priority

February 25, 2011 11:10 PM | CNA / María Fernandez Noguera / Gaspar Pericay Coll

The Mediterranean Railway Corridor has been constantly overlooked even though it is a key infrastructure for Catalonia, Valencia, Murcia, Andalucía,and also for Spain and even the European Union. In the last few years, the Socialist Spanish Government was constantly pushing for the Central Pyrenees Corridor (going through the Pyrenees in Aragon) for electoral and regional equilibrium reasons but the Mediterranean one was hardly mentioned. Is the EU going to include the Mediterranean Railway Corridor in its agenda?