Electric company ENDESA checks out 2,500 km of the Girona network to prevent future failures
With a helicopter, ENDESA is checking the entire Girona province?s medium tension electric network and has found 50 weak points so far. This operation is being pursued to prevent damage from past collapses of the electrical network, especially in the Cost